FR fr
EN en
ACV
: : Home

If you want to be notified of in case publication of new tenders, please provide your email (no abuse from us). These tenders are mainly written in French:


 

 

Tenders


Mainly of tenders are written in French but some are written in English. That shows a collective will to have a greater representativeness at European and international level by doing some studies in English.


Please, applications must be submitted on the prescribed forms no later than the indicated closing date.

flechResponse model [to download]
flechReport model [to download]

Meetings relating to projects are held in Paris.


Submit response:     

By mail to:

contact@scorelca.org

   AND

by online filing
on this page



   Nb Title  Deadline
Download
Answer
Conducted by
   2020-05 Innovative methods for resource accounting in LCA
2021-06-04 See
repondre-ao
-
   2020-03 Benchmark of circularity indices and links with LCA
See
Centrale Supelec et Evea
   2020-01 Indicateur ACV « Gaz à effet de serre », définition et application : l'enjeu temporel
See
EVEA et IFPEN
   2020-02 Neutralité carbone
See
Ecoact et Elys
   2019-05 Labellisations et ICV des Matières Premières issues du Recyclage (MPR)
See
Vertech et BRGM
   2019-04 Captation du carbone en vue de son utilisation et de son stockage (CCU et CCS) – apports et limites de l’ACV
See
CIRAIG
   2019-01 Considering particles in impact assessment methods
See
I Care
   2019-03 Impacts environnementaux des objets connectés et des services basés sur leur utilisation : ordres de grandeurs et recommandations méthodologiques
See
consortium Négaoctet (LCIE, DDemain, GreenIT, Neutreo)
   2018-01 Environmental impacts of mining operations for some raw materials
See
Vertech , BRGM et E-Mines
   2018-05 Indicateur ressources renouvelables
See
Verso
   2018-02 Boucles matière, boucles produit et ACV
See
Vertech et CEA
   2018-03 Environmental avoided impacts and avoided emissions
See
Vertech et Université de Bordeaux
   2018-04 Comment les marchés intègrent-ils l’environnement, en particulier les activités d’Empreinte Environnementale ?
See
Deloitte et Icare
   2017-02 Scénarios de transitions énergétiques : forces et faiblesses de l’ACV dans une perspective de ressources limitées
See
Icare et Evea
   2017-01 ACV et éco-conception : Interactions et recommandations
See
We Loop et Avnir
barre
mb
© SCORELCA | Legal notices | Contact |